Technical data
Use location | Paved surface, asphalt, structure, median crossing | |
Type of use | Temporary | |
Containment level | T1 | T3 |
Working width | W1 | W1 |
Norm. working width | 0.4 m | 0.6 m |
Dynamic deflection | 0.16 m | 0.39 m |
ASI | A | A |
End anchorage | no | no |
Test no. light vehicle | BASt 2012 7S 55 | BASt 2012 7S 55 |
Test no. heavy vehicle | BASt 2012 7S 55 | |
Test length | 132 m | |
System length | 12 m | |
System height | 0.6 m | |
System width | 24 cm | |
Planning width | 11 cm | |
Area of operation | A B D E |