Technical data
| Use location | Paved surface, asphalt, structure, median crossing | |
| Type of use | Temporary | |
| Containment level | T1 | T3 |
| Working width | W1 | W1 |
| Norm. working width | 0.4 m | 0.6 m |
| Dynamic deflection | 0.16 m | 0.39 m |
| ASI | A | A |
| End anchorage | no | no |
| Test no. light vehicle | BASt 2012 7S 55 | BASt 2012 7S 55 |
| Test no. heavy vehicle | BASt 2012 7S 55 | |
| Test length | 132 m | |
| System length | 12 m | |
| System height | 0.6 m | |
| System width | 24 cm | |
| Planning width | 11 cm | |
| Area of operation | A B D E | |