Technical data
.
Grounding, Type | Paved surface, asphalt, construction, median crossing | |
Use type | Temporary | |
Containment level | T1 | T3 |
Working width | W1 | W4 |
norm. Working width | 0.6 m | 1.2 m |
Dyn. deflection | 0.42 m | 1.01 m |
ASI | A | A |
end anchorage | no | yes |
Test no. light vehicle | BASt 2013 7E 57 | BASt 2013 7E 57 |
Test no. heavy vehicle | — | BASt 2013 7E 57 |
Test length | 134 m | 134 m |
System length | 13.4 m | |
System height | 0.5 m | |
System width | 20 cm | |
Planning width | 9 cm | |
Area of operation | A B D E |
Containment level | T1 | T3 |
Working width | W1 | W4 |
ASI | A | A |
Dyn. deflection | 0.42 | 1.0 |