Technical data
Location | Paved surface, asphalt, construction, median crossing | ||
Use Type | Temporary | ||
Containment level | T1 | T3 | H1 |
Working width | W1 | W1 | W5 |
norm. Working width | 0.4 m | 0.6 m | 1.6 m |
Dyn. deflection | 0.20 m | 0.40 m | 1.40 m |
ASI | A | A | A |
End anchorage | yes | yes | yes |
Test no. light vehicle | BASt 2013 7E 53 | BASt 2013 7E 53 | BASt 2013 7E 54 |
Test no. heavy vehicle | — | BASt 2013 7E 53 | BASt 2013 7E 54 |
Test length | 161 m | 161 m | |
System length | 13.4 m | ||
System height | 0.5 m | ||
System width | 20 cm | ||
Planning width | 9 cm | ||
Area of operation | A B D E |
Containment level | T1 | T3 | H1 |
Working width | W1 | W1 | W5 |
ASI | A | A | A |
Dyn. deflection | 0.20 | 0.4 | 1.4 |