Technical data
Location | Paved surface, asphalt, construction, median crossing | |||
Use type | Temporary, Permanent | |||
Detention level | T1 | T3 | H1 | H2 |
Working width | W1 | W2 | W4 | W5 |
norm. Working width | 0.4 m | 0.8 m | 1.3 m | 1.6 m |
Dyn. deflection | 0.04 m | 0.43 m | 0.94 m | 1.30 m |
ASI | A | A | B | B |
end anchorage | no | no | yes | yes |
Test no. light vehicle | BASt 2009 7S 55 | BASt 2009 7S 55 | BASt 2009 7S 56 | BASt 2018 7E 58 |
Test no. heavy vehicle | — | BASt 2009 7S 55 | BASt 2009 7S 56 | BASt 2018 7E 58 |
Test length | 132 m | 132 m | 132 m | 132 m |
System length | 12 m | |||
System height | 0.8 m | |||
System width | 34 cm | |||
Planning width | 14 cm | |||
Area of operation | A B D E |
Containment level | T1 | T3 | H1 | H2 |
Working width | W1 | W2 | W4 | W5 |
ASI | A | A | B | B |
Dyn. deflection | 0.04 | 0.4 | 0.9 | 1.3 |