Technical data
.
Location | Paved surface, asphalt, construction, median crossing | ||
Use type | Temporary, Permanent | ||
Containment level | T1 | T3 | H2 |
Working width | W2 | W3 | W8 |
norm. Working width | 0.8 m | 1.0 m | 3.1 m |
Dyn. deflection | 0.10 m | 0.30 m | 2.42 m |
ASI | A | A | B |
End anchorage | yes | yes | yes |
Test no. light vehicle | BASt 2008 7S 53 | BASt 2008 7S 53 | BASt 2002 7S 26 |
Test no. heavy vehicle | — | BASt 2008 7S 53 | BASt 2002 7S 26 |
Test length | 120 m | 120 m | 68 m |
System length | 12 m | ||
System height | 0.9 m | ||
System width | 70 cm | ||
Planning width | 40 cm | ||
Area of operation | A B D E |
Containment level | T1 | T3 | H2 |
Working width | W2 | W3 | W8 |
ASI | A | A | B |
Dyn. deflection | 0.10 | 0.3 | 2.4 |